Rising Tide Towers II, LLC (“RTT”), together with Wireless Partners FN, LLC (“WP”), is seeking approval from the Vermont Public Utility Commission to construct and install a new communications support structure and wireless communications facility, located off North Street, Wells, Vermont, on property owned by Philip M. Welch.  Downs Rachlin Martin PLLC (“DRM”) represents Rising Tide in connection with the Project.

Review a copy of the advance notice and accompanying materials here: Advance Notice

A balloon test for the proposed Facility was conducted on June 19, 2024 between 9:00 am and 1:00 pm.  The balloon was flown at a height of 193’ in order to produce photo simulations documenting the project’s visibility from various locations and historic sites in the vicinity of the project.  Photographic simulations, together with photographic keys showing locations from which the photographs were taken, are now available for viewing by clicking the link below.  Please continue to visit this page for additional information regarding the Project.

Download supplement