Vermont Transco LLC, acting by and through its manager, Vermont Electric Power Company, Inc. (“VELCO”) proposes to install a 110’ monopole telecommunications tower at Eagle Camp Road, South Hero, Vermont on the same property as an existing VELCO / Vermont Electric Cooperative, Inc. (“VEC”) substation, and to relocate existing wireless communications equipment from the substation to the new tower, as stated in the Advance Notice dated February 13, 2019.

The Project will be part of VELCO’s statewide radio project, a private mobile communications network intended to improve worker safety and power outage recovery time by providing a means of communications among VELCO, utilities and third party contractors.

A balloon test was conducted on February 27, 2019. The balloon was flown at a height of 110’ in order to produce photo simulations documenting the project’s visibility and a viewshed analysis. The balloon was flown from roughly 9am until 1pm. Weather conditions on the day of the float were good, with low winds and no precipitation.

The viewshed and photographic simulations can be viewed at the links below:

You can view "56_VSHED_PKG_VSS_LLC_03012019.pdf" at: https://documentcloud.adobe.com/link/track?uri=urn%3Aaaid%3Ascds%3AUS%3A42be42bb-e2fb-4d7f-a447-2393af8f95fa

You can view "56_SIM_PKG_VSS_LLC_03012019.pdf" at: https://documentcloud.adobe.com/link/track?uri=urn%3Aaaid%3Ascds%3AUS%3Af8f45def-780f-494b-8cd7-879187b14991

Questions should be directed to Ben Campbell, ben@airosmithdevelopment.com.


Vermont Transco LLC, acting by and through its manager, Vermont Electric Power Company, Inc. (“VELCO”) proposes to install a 110’ monopole telecommunications tower at Eagle Camp Road, South Hero, Vermont on the same property as an existing VELCO / Vermont Electric Cooperative, Inc. (“VEC”) substation, and to relocate existing wireless communications equipment from the substation to the new tower, as stated in the Advance Notice dated February 13, 2019.

The Project will be part of VELCO’s statewide radio project, a private mobile communications network intended to improve worker safety and power outage recovery time by providing a means of communications among VELCO, utilities and third party contractors.

At the present time, a balloon test is planned for February 27, 2019, with a backup date of Friday, March 1, 2019. A balloon will be flown at a height of 110’ in order to produce photo simulations documenting the project’s visibility. The balloon will be flown from roughly 9am until noon, which time period may be shortened or lengthened depending on weather conditions.

These photographic simulations will be available for viewing, together with a viewshed analysis, during the 60-day advance notice period, and prior to submission of the certificate of public good petition.

Please check this website to receive up-to-date information regarding the timing of the test, and any materials.

X

Before sending, please note: Information on www.drm.com is for general use and is not legal advice. The mailing of this email is not intended to create, and receipt of it does not constitute, an attorney-client relationship. Anything that you send to anyone at our Firm will not be confidential or privileged unless we have agreed to represent you. In particular, please note that Downs Rachlin Martin’s Labor & Employment Group exclusively represents employers/management in labor and employment matters. Employees seeking assistance with labor or employment issues should contact a law firm that represents employees and should not provide information about your situation to DRM.